Enterprise Pipeline Rehab
Pipe Creek, Texas
Erosion Control/Pipeline Protection on Creek Crossings
Pipeline protection was required for crossings of an intermittent, but fast rising creek aptly named pipe creek. This creek, while usually tranquil, can become a raging river during heavy rain events in the hill country of central Texas.
Shoretec BD 600 CC was utilized to protect pipeline crossings from limestone rock and debris in the high flow creek. The mats were installed by T&R Pipeline Construction, Inc. In a remote location using just an excavator, and limited man power in just 3 days.
|
|
Project Team Members:
Owner:
Enterprise Products Partners
Engineer:
Enterprise Products Partners
Contractor:
T&R Pipeline Construction, Inc.
Technical Description:
Product: Shoreblock® BD 600 CC
Area: 3,000 sf
Installation Date: Summer 2008
|
 Mats being installed |